Description


By default 20 jobs can run in parallel in Infoworks ADE. If there are 24 jobs that are triggered at a time, 20 jobs will run in parallel and rest of the 4 jobs will be in blocked state waiting for the executors to run. If 4 jobs out of these 20 jobs are finished then 4 jobs from the waiting pool will be kick started.


There is a config available to increase the number of jobs that can run in parallel. Perform the below steps to configure the same.


a) Login to Infoworks edge node using the infoworks user.

b) Go to $IW_HOME/conf directory.

c) Open the conf.properties file and add the below config. (Add this config if it is not present already in the file)

     iw_num_executors=40

d) Restart Hangman